  • Redevelopment of four generating stations on the Upper Mattagami River for Ontario Power Generation

    The project consisted in the replacement of four generating stations built in the early 1900's,...

    See more
  • Nyadi Hydroelectric Plant Project, Nepal

    Preliminary Assessment of Environmental and Social Impacts Assessment

    See more
  • Rapides-des-Cèdres 9 MW Hydroelectric Plant

    After evaluating the project with Services Énergie Brascan, BPR was mandated to carry out the...

    See more
  • Wind Energy Park, Baie-des-Sables

    These towers are 80 meters high and support a 50 metric ton turbine with 3...

    See more
  • Wind Energy Park, Anse-à-Valleau

    Within the framework of a project to implement 65 windmills, BPR carried out the analysis...

    See more
  • Khudi : 3 800 kW Hydroelectric Plant in Nepal

    The design included a dam that was 30-meters in length, a sedimentation tank, an aqueduct...

    See more
  • 109.5 MW Wind Farm - Carleton

    Detailed engineering for the windfarm of 73 turbines in Carleton.

    See more
  • 127.5 MW Jardin d'Éole Wind Farm, St-Ulric

    Detailed electrical design for St-Ulric's collector system.

    See more
  • Jardin d'Eole Wind Farm Harmonics Emissions - St-Ulric

    Study of the harmonics injected into Hydro-Quebec’s transmission network.

    See more
  • 109.5 MW Wind Farm - Baie-des-Sables

    Design of the foundations for the wind turbine support towers.

    See more
  • Eastmain-1 Hydroelectric Development

    Construction management of the 480 MW hydroelectric power project.

    See more
  • Rehabilitation of the Besy powerhouse

    Construction of a new 17 MW hydroelectric powerhouse on the existing site.

    See more
  • 24.4 MW Hydroelectric Complex on the White River

    Detailed engineering for the 24.4 MW hydroelectric complex on the White River.

    See more
  • Refurbishment of GS-4 Generating Station - Ottawa

    Major refurbishment of the hydroelectric generating station and power increase from 7 to 8 MW.

    See more
  • Study of dam break detection and warning systems

    Research and study of the design of effective detection and warning systems applicable in a...

    See more
  • Complete Reconstruction of Regulating Dam on Ha! Ha! River

    Full reconstruction of the retention dams on the Rivière Ha! Ha! after the 1996 Saguenay...

    See more
  • Dam Safety Assessement - La Pulpe

    Structure safety assessement including inspection, stability analysis, modeling and emergency measures plan

    See more
  • Hydraulic, Hydrological and Stability Study and Analysis for Grade Trois-Pistoles Project

    Hydraulic/hydrological and stability study and analysis (including dam break) for technical approval of the project.

    See more