Municipal infrastructures in the industrial park

Customer: Régie du Parc industriel de Lotbinière (P.I.R.)

Expertise: Establishing of preliminary design, presentation of the application for funding, plans and specifications, cost estimate, resident supervision of all works, meetings and management of construction costs.

Schedule: Work carried out in fall of 2002 through summer of 2003

Description: The project consisted of carrying out the plans and specifications for Phase 1A (startup) of the Industrial Park, and to ensure the supervision of works over about 1500 meters. These works included carrying out the following works: the installation of aqueducts and sewer systems, the construction of a pumping system, digging of drainage ditches for rainwater runoff, road system and aqueduct cross pipe work carried out by drilling under highway 20 and a railroad.

In order to supply the Industrial park with potable water, it was necessary to install a 300 mm pipe over approximately 135 meters, by drilling under highway 20.